实施计划应包括的内容
前三部分的目标主要是让大家知道影响水损值的主要数据越精确越好。
1.供水量总计量的控制与优化方案
2.抄表及发单收费的优化方案
3.特许的非收费水量的控制与降低方案
接下来的三个部分的主要目标是降低水损每个主要元素。
4.
物理漏损的检测与降低方案:检测维修可见与不可见漏水点,更新管网,控制蓄水池溢流。
5.减少水表(负)误差数量方案,或称水表圆管理。(即减少慢表,提高收费水表)
6.商业水损的检测与降低方案(客户服务管理)
最后,不论使用什么方案降低水损,只有改进公司的运行状况(架构、流程、人力资源等)才能产生永久的效果。
下表列出了部分通常要求的典型诊断和行动计划。
|
TYPE OF
LOSS 水损类别 |
|
D:DIAGNOSTIC(*)诊断 |
|
P: ACTION
PLAN(**) |
A |
EFFICIENCY
CALCULATION 效率计算 |
|
|
|
|
|
Volumes produced and
imported 生产及输入水量与输出水量 |
DA1 |
Existence of
meters(or not) |
PA1 |
Installation or
replacement of flowmeters |
|
|
DA2 |
Maintenance
procedures |
PA2 |
Improvement of
maintenance procedures |
|
|
DA3 |
Test on
meters |
PA3 |
Tests and calibration
of flow-meters(continued) 调试校正流量计 |
|
Volumes consumed and
billed 认可消费水量和发单水量 |
DA4 |
Diagnostic of
customers procedures |
PA4 |
Improvement of
customers procedures |
|
|
DA5 |
Diagnostic of
information system |
PA5 |
Improvement of
replacement of |
|
Volumes legally
consumed |
DA6 |
Inventory |
PA6 |
Meter installation
campaign (when possible) |
|
|
DA7 |
Measurement or
evaluation procedures |
PA7 |
Reduction of water
service consumption |
|
|
DA8 |
Test of
evaluation |
PA8 |
Reduction of
exonerated consumption |
|
General 概述 |
DA9 |
History |
PA9 |
|
B |
PHYSICAL |
|
|
|
|
|
Visible
leaks |
DB1 |
Statistic |
PB1 |
Improvement or
creation of call centers |
|
|
DB2 |
Audit on
procedures |
PB2 |
Reduction of repair
duration |
|
|
DB3 |
Visual pilot
survey |
PB3 |
Formation of team for
visible leaks detection |
|
|
DB4 |
|
PB4 |
Location of leaks on
GIS |
|
Invisible
leaks |
DB5 |
Statistic |
PB5 |
Purchase of
equipment |
|
|
DB6 |
Audit on method
used |
PB6 |
Formation of team for
invisible leak detection |
|
|
DB7 |
Pilot detection
campaign |
PB7 |
Outsourcing of leak
detection |
|
|
DB8 |
|
PB8 |
Invisible leaks
detection and repair campaign |
|
|
DB9 |
|
PB9 |
Installation of a
monitoring |
|
Leaks on
mains |
DB10 |
Statistic |
PB10 |
Leak detection
campaign with appropriate equipment |
|
|
DB11 |
Audit on
procedures |
PB11 |
|
|
Tank
overflow |
DB12 |
Audit on protection
equipment |
PB12 |
Installation or
rehabilitation of tanks |
|
|
DB13 |
Audit on tele
information |
PB13 |
Remote system
control |
|
Tank
infiltration |
DB14 |
Audit of
drains |
PB14 |
Repair of leaks
and/or waterproof joints replacement 修漏或更换止水缝 |
|
General |
DB15 |
Audit on
sectorisation (districts) |
PB15 |
Waste districts
metering system 废水排放系统安表 |
|
|
DB16 |
Audit on pressure of
service |
PB16 |
Pressure Control
System |
C |
METERING
LOSSES |
|
|
|
|
|
Undermetering due to
|
DC1 |
Analyse of the
database |
PC1 |
Program of Meter
Replacement |
|
Undermetering due to
|
DC2 |
Sample study on large
customers |
PC2 |
Program of
Replacement or Resizing |
|
Undermetering due to
meter aging |
DC3 |
Sample study on small
meters |
PC3 |
Massive Replacement
Program of small meters |
|
|
DC4 |
Profile of
consumption |
PC4 |
Studies of
meters-datalogging |
|
|
DC5 |
|
PC5 |
Test of new meters
and technical watch |
|
|
DC6 |
|
PC6 |
Purchase of a meter
test bench |
D |
COMMERCIAL
LOSSES |
|
|
|
|
|
Illegal
connections |
DD1 |
Inventory on pilot
area |
PD1 |
Complete
census |
|
Frauds on registered
connectins |
DD2 |
Analyse of the
existing database |
PD2 |
Targeted
census |
|
|
DD3 |
Sample
surveys |
PD3 |
Targeted field
surveys |
|
Frauds on
equipment |
DD4 |
Inventory |
PD4 |
Communication
campaign |
|
|
DD5 |
Sample
surveys |
PD5 |
|
|
Low income
areas |
DD6 |
Pilot
surveys |
PD6 |
Multi-purpose actions
depending |
|
Billing
losses |
DD7 |
Survey on IS and
procedures |
PD7 |
Improvement of
Customer Services of procedures |
(*)通常来讲,任务D的黑体部分是最后诊断的内容。
(**)任务P的黑体部分是最常采用的措施。任务D与任务P同行之间没有关联。